439136-1_SR5_US_Resurfacing_Flyer_101918

YOU ARE INVITED TO A PUBLIC HEARING
On behalf of the Florida Department of Transportation (FDOT),
you are invited to a public hearing for the S.R. 5/U.S. 1
resurfacing project.

Date: Tuesday, Dec. 11, 2018

Time: Informal open house at 5:30 p.m.
6 p.m. formal presentation

Location: Ormond Beach Performing Arts Center
399 N. U.S. 1
Ormond Beach, FL 32174

Displays and other project information will be available for
review. Staff will be present to discuss the project and answer
questions.

FOR MORE INFORMATION, PLEASE CONTACT:
Marcus Lisicki, P.E.
FDOT Project Manager
Phone: 386‐943‐5542
Email: marcus.lisicki@dot.state.fl.us
Information about this project is also available on the web at
www.CFLRoads.com. Type 439136‐1 in the search box and hit
enter.

PROPOSED IMPROVEMENTS
The purpose of the project is to resurface S.R. 5/U.S. 1 from
Woodland Avenue to the Flagler County line. In addition to
resurfacing the roadway, this project includes various safety
improvements such as filling in sidewalk gaps in some areas,
evaluating the need to correct guardrail deficiencies,
widening the outside shoulder on the northbound lane to
accommodate bicycles, extending turn lanes as needed,
signalization and lighting upgrades, and access management
changes.

HOW CAN YOU BE INVOLVED?
• Provide your comments verbally to a member of the
project team at the public hearing.
• Fill out a comment form and drop it in the comments box
at the comments table at the public hearing.
• Take a comment form with you and mail it to the address
shown on the form.
• Email or call the FDOT project manager (contact
information is to the left).
• Use the “Ask a Question” button under the project
manager’s contact information on the website.
All comments received by December 21, 2018, will become
part of the official public record for this hearing.
Persons